Steady progress is being made on the first A400M aircraft “MSN001” in Seville. In October, the fuselage barrel was joined to the nose fuselage section and equipped with the sponsons and landing gear.
The wing sections
were assembled and the four engine pylons installed. In November, the complete 42m long
wing structure was successfully integrated
with the fuselage and, in early December, the
fully-assembled empennage, (comprising the
vertical and horizontal tail plane), and the
main landing gear doors were put in place.

In parallel, a development engine was delivered
to Marshall Aerospace in the third week of
November and installed on a modified C-130
airframe.
Engine trials with the flying test bed
will begin during the first quarter of 2008.



